Pollution Control Approvals – CFE & CFO

Every industrial or infrastructure project in India must obtain pollution clearances from the State Pollution Control Board (SPCB) before setup and operation. These include:

  • CFE (Consent for Establishment) – required before construction or installation begins

  • CFO (Consent for Operation) – required before commercial production or activity starts

At SS Consultancy, we help industries across sectors secure these vital environmental clearances in compliance with state and national pollution laws.

Why CFE & CFO Are Required

  • Mandatory under the Water Act, 1974 and Air Act, 1981

  • Ensures environmental safety and regulatory compliance

  • Necessary to start construction, obtain factory licence, or apply for power and finance

  • Failure to obtain clearance may result in project shutdowns, legal penalties, or cancellation of approvals

Applicability

All manufacturing and processing units—whether micro or large-scale—are classified into Red, Orange, Green, or White categories based on their pollution potential. Each category has specific clearance and documentation norms.

Services We Offer

  • Assessment of pollution category and clearance requirements

  • Preparation of CFE/CFO application and technical documents

  • Layout review and pollution load calculations

  • Filing and tracking of application with State Pollution Control Board

  • On-site coordination for inspection and compliance checks

  • Advisory on waste disposal, treatment, STP/ETP, and stack height norms

Documents Required

  • Factory Plan Approval or Building Permit

  • Site Layout with location of machinery, utilities, and waste outlets

  • Land documents / Lease agreement

  • Manufacturing process flowchart

  • Raw materials and end products list

  • Water, fuel, and power consumption details

  • Effluent and emission estimates

  • DG set details, STP/ETP layout if applicable

  • Authorization letters and compliance undertakings

Compliance Continuity

CFO is generally granted for 1 to 5 years, depending on pollution category. Timely renewal, modification, or expansion approvals are required for ongoing legal compliance.

SS Consultancy’s End-to-End Support

  • Category classification and feasibility check

  • Site visit and technical evaluation

  • Application preparation for CFE and CFO

  • Pollution mitigation plan and waste handling compliance

  • Assistance in installation of required control systems

  • Renewal and post-approval audit coordination

Start Your Project with Environmental Compliance

Let SS Consultancy help you secure pollution control clearances smoothly and correctly—ensuring your project is legal, sustainable, and future-ready.

Email: info@ssconsultancy.net
Phone: +91 92468 22006