TS-iPASS is an online single-window clearance system that allows industries, manufacturing units, and service companies to obtain required approvals, licenses, and certifications within a defined time frame.
The system eliminates the need for multiple departmental visits and provides a single interface for all industrial approvals.
Single-window system for industrial approvals
Faster processing of licenses and clearances
Online submission of applications and documents
Digital payment for approvals and permissions
Investor Facilitation Cell providing a single point of contact
Dedicated grievance and feedback mechanism for quick issue resolution
The TS-iPASS framework replaced the earlier Industrial Single Window Clearance Act of 2002 and significantly improved the efficiency of approval procedures in Telangana.
The primary goals of the TS-iPASS system include:
Accelerating the approval process for industrial licenses and permits
Promoting rapid industrial development in Telangana
Creating a business-friendly regulatory environment
Encouraging investments and entrepreneurship
Generating employment opportunities
Ensuring environmental protection while enabling industrial growth
The TS-iPASS system includes several features that make industrial approvals faster and more transparent.
Pre-scrutiny of applications is conducted twice every week
Applications are evaluated through a single point approval system
District Committees review applications and forward them to the State-level TS-iPASS Committee
Mega projects can receive approvals through self-certification
Applicants receive acknowledgment within 15 days
Departments are subject to penalties for delays in approvals
Ensures transparency and accountability in the approval process
TS-iPASS also supports the development of essential infrastructure for sectors such as:
Information Technology
Healthcare
Communication services
Industrial infrastructure development
Businesses can obtain multiple approvals through the TS-iPASS portal, including:
Pollution Control Board approvals for industrial establishment
Factory plan approval from the Factory Department
Building plan approvals from HMDA, DTCP, or KUDA
Land conversion permissions
Non-Agricultural Land Assessment (NALA) conversion approval
Power feasibility approval from TSSPDCL
No Objection Certificate from Gram Panchayat
Fire Department clearance
Water supply and sewage permission from the Water Board
This integrated system significantly reduces the complexity of obtaining multiple approvals from different departments.
Projects are categorized based on the investment in plant and machinery or equipment.
Manufacturing: Up to ₹25 lakh
Services: Up to ₹10 lakh
Manufacturing: ₹25 lakh – ₹5 crore
Services: ₹10 lakh – ₹2 crore
Manufacturing: ₹5 crore – ₹10 crore
Services: ₹2 crore – ₹5 crore
Manufacturing: ₹10 crore – ₹200 crore
Manufacturing: Above ₹200 crore
All approvals under TS-iPASS are applied using the Combined Application Form (CAF).
The CAF must be submitted online along with:
Self-certification declaration
Required application fees
Supporting documents and attachments
In special cases, applications may also be submitted manually through the designated Nodal Agency as per government guidelines.
Projects are processed under different authorities depending on the investment value.
Applicable for projects with investment up to ₹5 crore in plant and machinery.
Applicable for projects with investment between ₹5 crore and ₹200 crore.
Applicable for mega projects above ₹200 crore or projects generating employment for more than 1,000 people.
The TS-iPASS Act ensures time-bound approvals.
| Investment Amount | Approval Time |
|---|---|
| Projects below ₹200 crore | Maximum 30 days |
| Projects above ₹200 crore | Within 15 days |
For mega projects, approvals can be granted through self-certification without waiting for multiple departmental clearances.
When land is allocated through TSIIC or other government agencies, companies must comply with the following conditions:
Financial closure must be completed within one year
Industrial operations must commence within two years
If these conditions are not met, the allocated land may be reclaimed by the government.
Applicants typically need to submit the following documents:
Signed Annexure-I declaration
Site layout and land documents
Building plan drawings
Certificate of Incorporation
HMDA or planning authority documents
Form B1 and Form B2 (for red category industries)
Combined Application Form (CAF)
Supporting approvals and attachments
TS-iPASS registration and application filing
Preparation of Combined Application Form (CAF)
Documentation and compliance support
Pollution control approvals
Factory and building plan approvals
Industrial land conversion (NALA)
Coordination with government departments
Our team ensures fast, compliant, and hassle-free approvals for setting up industries in Telangana.