Every industrial or infrastructure project in India must obtain pollution clearances from the State Pollution Control Board (SPCB) before setup and operation. These include:
CFE (Consent for Establishment) – required before construction or installation begins
CFO (Consent for Operation) – required before commercial production or activity starts
At SS Consultancy, we help industries across sectors secure these vital environmental clearances in compliance with state and national pollution laws.
Mandatory under the Water Act, 1974 and Air Act, 1981
Ensures environmental safety and regulatory compliance
Necessary to start construction, obtain factory licence, or apply for power and finance
Failure to obtain clearance may result in project shutdowns, legal penalties, or cancellation of approvals
All manufacturing and processing units—whether micro or large-scale—are classified into Red, Orange, Green, or White categories based on their pollution potential. Each category has specific clearance and documentation norms.
Assessment of pollution category and clearance requirements
Preparation of CFE/CFO application and technical documents
Layout review and pollution load calculations
Filing and tracking of application with State Pollution Control Board
On-site coordination for inspection and compliance checks
Advisory on waste disposal, treatment, STP/ETP, and stack height norms
Factory Plan Approval or Building Permit
Site Layout with location of machinery, utilities, and waste outlets
Land documents / Lease agreement
Manufacturing process flowchart
Raw materials and end products list
Water, fuel, and power consumption details
Effluent and emission estimates
DG set details, STP/ETP layout if applicable
Authorization letters and compliance undertakings
CFO is generally granted for 1 to 5 years, depending on pollution category. Timely renewal, modification, or expansion approvals are required for ongoing legal compliance.
Category classification and feasibility check
Site visit and technical evaluation
Application preparation for CFE and CFO
Pollution mitigation plan and waste handling compliance
Assistance in installation of required control systems
Renewal and post-approval audit coordination
Let SS Consultancy help you secure pollution control clearances smoothly and correctly—ensuring your project is legal, sustainable, and future-ready.
Email: info@ssconsultancy.net
Phone: +91 92468 22006
Hyderabad
+91 92468 22006